68 Normas Europeas FprEN 61010-2-030:2016 Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-030: Particular requirements for testing and measuring circuits Fecha Límite: 2016-11-18 FprEN 61010-2-034:2016 Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-034: Particular requirements for measurement equipment for insulation resistance and test equipment for electric strength Fecha Límite: 2016-11-18 CLC/TC ALARM SYSTEMS EN 50131-1:2006/FprA2:2016 Alarm systems - Intrusion and hold-up systems - Part 1: System requirements Fecha Límite: 2017-01-13 FprEN 50134-7 Alarm systems - Social alarm systems - Part 7: Application guidelines Fecha Límite: 2016-11-18 CLC/TC SOLAR PHOTOVOLTAIC ENERGY SYSTEMS FprEN 61215-1-2:2016 Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-2: Special requirements for testing of thin-film Cadmium Telluride (CdTe) based photovoltaic (PV) modules Fecha Límite: 2016-11-11 FprEN 61215-1-3:2016 Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-3: Special requirements for testing of thin-film amorphous silicon based photovoltaic (PV) modules Fecha Límite: 2016-11-11 FprEN 61215-1-4:2016 Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-4: Special requirements for testing of thin-film Cu(In,GA)(S,Se)2 based photovoltaic (PV) modules Fecha Límite: 2016-11-11 FprEN 62670-3:2016 Photovoltaic concentrators (CPV) - Performance testing - Part 3: Performance measurements and power rating Fecha Límite: 2016-12-23 FprEN 62788-1-6:2016 Materials used in photovoltaic modules - Measurement procedures - Part 1-6: Encapsulants - Test methods for determining the degree of cure in Ethylene-Vinyl Acetate Fecha Límite: 2016-12-16 FprEN 62925:2016 CPV modules - Thermal cycling test to differentiate increased thermal fatigue durability Fecha Límite: 2016-11-18 prEN 62979:2016 Photovoltaic module bypass diode thermal runaway test Fecha Límite: 2016-11-18 CLC/TC OPTICAL FIBRES AND OPTICAL FIBRE CABLES FprEN 60794-1-2:2016 Optical fibre cables - Part 1-2: Generic specification - Basic optical cable test procedures - General guidance Fecha Límite: 2016-11-18 FprEN 60794-2-22:2016 Optical fibre cables - Part 2-22: Indoor cables - Detail specification for multi-simplex breakout optical cables to be terminated with connectors Fecha Límite: 2016-11-11 prEN 60793-1-1:2016 Optical fibres - Part 1-1: Measurement methods and test procedures - General and guidance Fecha Límite: 2016-11-11 prEN 60793-1-60:2016 Optical fibres - Part 1-60: Measurement methods and test procedures - Beat length Fecha Límite: 2016-11-04 prEN 60793-1-61:2016 Optical fibres - Part 1-61: Measurement methods and test procedures - Polarization crosstalk Fecha Límite: 2016-11-04 prEN 60793-2-70:2016 Optical fibre - Part 2-70: Product specifications - Sectional specifications for polarization-maintaining fibres Fecha Límite: 2016-11-04 prEN 60794-1-22:2016 Optical fibre cables - Part 1-22: Generic specification - Basic optical cable test procedures - Environmental test methods Fecha Límite: 2016-11-04 prEN 60794-1-23:2016 Optical fibre cables - Part 1-23: Generic specification - Basic optical cable test procedures - Cable element test methods Fecha Límite: 2016-11-04 CLC/TC FIBRE OPTIC INTERCONNECT, PASSIVE AND CONNECTORISED COMPONENTS prEN 61300-3-30:2016 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-30: Examinations and measurements - Endface geometry of rectangular ferrule Fecha Límite: 2017-02-17 prEN 61754-7-2:2016 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 7-2: Type MPO connector family - Two fibre rows Fecha Límite: 2016-11-18 CLC/TC WIND TURBINE FprEN 61400-12-1:2016 Wind power generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines Fecha Límite: 2016-12-16 FprEN 61400-25-6:2016 Wind power generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring Fecha Límite: 2016-11-18
normasaldia321
To see the actual publication please follow the link above