54 Normalización Europea CEN/TC 327 ANIMAL FEEDING STUFFS - METHODS OF SAMPLING AND ANALYSIS FprEN 17053 Animal feeding stuffs: Methods of sampling and analysis - Determination of trace elements, heavy metals and other elements in feed by ICP-MS (multi-method) Fecha Límite: 2017-10-26 CEN/TC 341 GEOTECHNICAL INVESTIGATION AND TESTING FprEN ISO 14688-1 Geotechnical investigation and testing - Identification and classification of soil - Part 1: Identification and description (ISO/FDIS 14688-1:2017) Fecha Límite: 2017-10-21 FprEN ISO 17892-7 Geotechnical investigation and testing - Laboratory testing of soil - Part 7: Unconfined compression test (ISO/FDIS 17892-7:2017) Fecha Límite: 2017-10-23 CEN/SC SECRETARÍA CENTRAL FprCEN ISO/TS 14027 Environmental labels and declarations - Development of product category rules (ISO/TS 14027:2017) Fecha Límite: 2017-12-07 EN ISO 15085:2003/FprA Small craft - Man-overboard prevention and recovery - Amendment 2 (ISO 15085:2003/FDAmd 2:2017) Fecha Límite: 2017-11-14 CEN/CLC/TC 3 QUALITY MANAGEMENT AND CORRESPONDING GENERAL ASPECTS FOR MEDICAL DEVICES FprEN ISO 80369-1 rev Small-bore connectors for liquids and gases in healthcare applications - Part 1: General requirements (ISO/ FDIS 80369-1:2017) Fecha Límite: 2017-10-20 CLC/TC 8X SYSTEM ASPECTS OF ELECTRICAL ENERGY SUPPLY CLC/FprTS 50654-1 HVDC Grid Systems and connected Converter Stations - Guideline and Parameter Lists for Functional Specifications - Part 1: Guidelines Fecha Límite: 2017-12-15 CLC/FprTS 50654-2 HVDC Grid Systems and connected Converter Stations - Guideline and Parameter Lists for Functional Specifications - Part 2: Parameter Lists Fecha Límite: 2017-12-15 CLC/TC 9X ELECTRICAL AND ELECTRONIC APPLICATIONS FOR RAILWAYS FprEN 62928:2017 Railway applications - Rolling stock - Onboard lithiumion traction batteries Fecha Límite: 2017-10-20 CLC/SR 29 ELECTROACOUSTICS FprEN 60942:2017 Electroacoustics - Sound calibrators Fecha Límite: 2017-11-03 CLC/TC 31 ELECTRICAL APPARATUS FOR POTENTIALLY EXPLOSIVE ATMOSPHERES FprEN 60079-0:2017 Explosive atmospheres - Part 0: Equipment - General requirements Fecha Límite: 2017-11-03 FprEN 60079-15:2017 Explosive atmospheres - Part 15: Equipment protection by type of protection “n” Fecha Límite: 2017-10-27 CLC/SR 37 SURGE ARRESTERS FprEN 60099-5:2017 Surge arresters - Part 5: Selection and application recommendations Fecha Límite: 2017-11-03 FprEN 60099-8:2017 Surge arresters - Part 8: Metal-oxide surge arresters with external series gap (EGLA) for overhead transmission and distribution lines of a.c. systems above 1 kV Fecha Límite: 2017-10-13 CLC/SR 37B SPECIFIC COMPONENTS FOR SURGE ARRESTERS AND SURGE PROTECTIVE DEVICES FprEN 61643-331:2017 Components for low-voltage surge protection - Part 331: Performance requirements and test methods for metal oxide varistors (MOV) Fecha Límite: 2017-11-03 CLC/TC 57 POWER SYSTEM MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE EN 61850-6:2010/FprA1:2017 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in power utility automation systems related to IEDs Fecha Límite: 2017-10-27 CLC/TC 61 SAFETY OF HOUSEHOLD AND SIMILAR ELECTRICAL APPLIANCES EN 61770:2009/FprAA:2017 Electric appliances connected to the water mains - Avoidance of backsiphonage and failure of hose-sets Fecha Límite: 2017-11-17 CLC/TC 65X INDUSTRIAL-PROCESS MEASUREMENT, CONTROL AND AUTOMATION FprEN 62828-1:2017 Reference conditions and procedures for testing industrial and process measurement transmitters - Part 1: General procedures for all types of transmitters Fecha Límite: 2017-10-20 CLC/TC 81X LIGHTNING PROTECTION FprEN 62793:2017 Protection against lightning - Thunderstorm warning systems Fecha Límite: 2017-12-01 CLC/TC 86BXA FIBRE OPTIC INTERCONNECT, PASSIVE AND CONNECTORISED COMPONENTS FprEN 61754-7-2:2017 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 7-2: Type MPO connector family - Two fibre rows Fecha Límite: 2017-11-03
normasaldia330
To see the actual publication please follow the link above